Results in Latvia

All twelve projects were successfully completed by June 2017. The initial objectives have been achieved and in some projects even surpassed.

A man digging out soil contaminated by oil with the help of a digger.
Latvia: In the Riga port area, 1,700 tonnes of layers of floating petroleum have been pumped out and 7,000 tonnes of contaminated soil removed. ©SECO

An overview of the results: