WASH Programme 1st Phase
Sanitation, in contrary to water, is not an official priority and is often even not mentioned by national or local authorities. Since human excreta is the major source of contamination of water, soil, food and peoples' environment, without proper disposal of human excreta no remedy will help reduce the diarrheal diseases.
Pays/région | Thème | Période | Budget |
---|---|---|---|
Corée, République populaire démocratique |
Eau
Eau potable et Services d'assainissement de base (WASH) (til 2016)
Conservation des ressources en eau Politique du secteur de l’eau |
01.05.2012
- 31.12.2013 |
CHF 610’000
|
- Oevre suisse d’entraide ouvrière
- Ministry of City Management European Union Project Support UNDP WHO
-
Secteur selon catégorisation du Comité d'aide au développement de l'OCDE DISTRIBUTION d'EAU & ASSAINISSEMENT
DISTRIBUTION d'EAU & ASSAINISSEMENT
DISTRIBUTION d'EAU & ASSAINISSEMENT
Sous-Secteur selon catégorisation du Comité d'aide au développement de l'OCDE Approvisionnement en eau potable et assainissement - dispositifs de base
Préservation des ressources en eau (y compris collecte de données)
Politique et gestion administrative du secteur de l’eau
Thème transversal Le projet contribue à améliorer le fonctionnement de l'organisation partenaire
Type de soutien Aide publique au développement (APD)
Type de collaboration Coopération bilatérale
Type de financement Don
Type d'aide Contribution à des projets ou programmes
Aide liée/non liée Aide non liée
Numéro de projet 7F07222
Contexte |
The situation in the water and sanitation sector in the DPRK has deteriorated since the early 90s, when most towns had piped water supply systems and waste water treatment. The facilities still exist; however, they are malfunctioning due to leakages, break downs and poor maintenance or due to lack of electrical power to run pumping systems. With the failure of sanitation infrastructure, diarrhea is the number one cause of morbidity and mortality for children under-five years. |
Objectifs |
WASH is directly linked to people’s health, their livelihoods and sustainable development. The activities fight effectively diarrhea and therefore have positive effects on the nutritional situation as well as on the health situation of targeted population. (Reduction of waterborne disease) |
Groupes cibles |
Safe drinking water and Sanitation for all : Kubin Ri (Rural/ Hills) 3'500 people (435 hh /1 '685 people, 17 institutions); Drinking water in Pyongwon (Rural/ Plains) 2'500 people (50 water points); Drinking water in Pyongwon City (Urban) 25'000 people (water kiosks) Technical support 30'000 people (total population Phase I) |
Effets à moyen terme |
Output 1.1 Additional Gravity Fed System (GFS) installations (low cost) in rural and urban hills area providing increased quantity of drinking water. Output 1.2. New Solar Pumping System (SPS) and Hand Pumps (HP) installations for wells and boreholes in rural and urban area will increase the quantity of safe drinking water. Output 1.3. Increased availability of improved sanitation facilities for the rural and urban population; Output 1.4. Increased knowledge of hygiene awareness for the rural and urban population with goal to reduce water-related and excretarelated diseases; Output 1.5. Increased# household using alternative energies as fuels for domestic needs (biogas i.e.). Output 2.1. Increased number of projects complying to WASH policy and applying approved techniques; Output 2.2. Share experiences and use synergies. Agree with MoCM on increased number of interventions with partner agencies (UNICEF, EUPs) at institutional and field levels; |
Résultats |
Principaux résultats antérieurs: SDC has no previous WASH program I the DPRK, but financed in 2010 a water kiosk project from NIT2 in Hamhung. Experiences with the since eight years ongoing SLM project show a positive impact at the project level and led to a constructive collaboration with the relevant ministry. Similar results can be expected in the WASH sector. |
Direction/office fédéral responsable |
DDC |
Crédit |
Aide humanitaire |
Partenaire de projet |
Partenaire contractuel |
Budget | Phase en cours Budget de la Suisse CHF 610’000 Budget suisse déjà attribué CHF 638’399 |
Phases du projet |
Phase 4
01.02.2017
- 31.12.2020
(Completed)
Phase 3
01.02.2015
- 31.03.2017
(Completed)
Phase 2
01.01.2013
- 31.12.2014
(Completed)
Phase 1 01.05.2012 - 31.12.2013 (Completed) |