JOR, GIZ, Wastewater Treatment in Azraq


In partnership with the EU, Switzerland will contribute to the construction of a wastewater treatment plant (WWTP) serving Azraq municipality and the nearby refugee camp. The proposed project stems from the Government of Jordan’s (GoJ) interest in developing integrated sanitation services that benefit both Jordanians and refugees, while also protecting the area’s groundwater resources. Switzerland will build on its established relationships with local communities to support efficient and sustainable wastewater management and demonstrate the potential of wastewater reuse.

Paese/Regione Tema Periodo Budget
Giordania
Acqua
nothemedefined
Igieniche d'aqua
01.08.2026 - 31.12.2029
CHF  4’000’000
Contesto Jordan remains one of the most water-scarce countries in the world and continues to host large numbers of Syrian refugees, placing sustained pressure on water and sanitation services. In response, the GoJ is promoting more integrated service delivery models. In Azraq, Switzerland had planned a wastewater treatment plant to serve Azraq town. As a result of recent discussion with the GoJ, a partnership with the European Union (EU) and the German Federal Ministry of Economic Cooperation and Development (BMZ) through GIZ was established to jointly built a WWTP that serves Azraq town and the nearby refugee camp optimizing investments and ensuring long-term sustainability.
Obiettivi To contribute to the development of a green, environmentally sustainable and socially inclusive economy through enhanced wastewater treatment and reuse practices in Azraq district, including Azraq refugee camp and Azraq town.
Gruppi target

Public authorities:

  • Azraq Municipality.
  • Ministry of Water and Irrigation (MoWI).
  • Water Authority of Jordan (WAJ).
  • UNICEF and UNHCR

Local community:

  • Azraq Town community, around 16,600 individuals.
  • Azraq Camp population around 30,000 individuals.
Effetti a medio termine Enhanced management of water and wastewater within Azraq Refugee Camp and Azraq town.
Risultati

Risultati principali attesi:  

Output 1: A comprehensive wastewater treatment solution for Azraq Camp and Azraq Town is ready for operation.

Output 2: Framework for income generation opportunities for Azraq camp refugees and hosting community are realised.

Output 3: Operational pre-conditions for Azraq wastewater treatment are in place. 

Output 4: Concept for treated wastewater re-use is disseminated.


Risultati fasi precedenti:  

  • Identification of the new project location in coordination with the GoJ, EU, BMZ and GIZ ensuring alignment.
  • Consultations on social and environmental aspects with local communities, authorities, and key stakeholders, fostering acceptance and ownership.
  • Completion of a topographic survey for the new site, with updated feasibility study and preliminary designs reflecting site-specific characteristics.


Direzione/Ufficio responsabile DSC
Partner del progetto Partner contrattuale
Instituzione statale straniera


Coordinamento con altri progetti e attori

High levels coordination with the GoJ together with other donors through the Ministry of Planning to ensure alignment with national priorities and refugee return dynamics.
At the operational level, Ministry of Water and Irrigation, Azraq Town Municipality, and UNICEF on wastewater collection in the town and camp. 

The intervention complements Switzerland’s water and sanitation support in refugee camps by improving efficiency and reducing operations and maintenance costs, enabling UNICEF to focus resources on other essential services.

Budget Fase in corso Budget Svizzera CHF    4’000’000 Budget svizzero attualmente già speso CHF    810’000 Progetto totale dalla prima fase Budget Svizzera CHF   2’953’390 Budget inclusi partner del progetto CHF   6’956’500
Fasi del progetto Fase 3 01.08.2026 - 31.12.2029   (Fase in corso) Fase 2 01.06.2023 - 31.05.2026   (Completed) Fase 1 01.07.2017 - 31.01.2023   (Completed)