Ecuador, Technical Support in Earthquake Resistant Reconstruction
An earthquake of the magnitude of 7.8 (Richter scale) hit Northern Ecuador, on 16 April 2016. Damages were widespread, collapsing structures within hundreds of km’s from the epicenter. Following SDC/HA’s emergency and early recovery interventions, SHA will provide the Ecuadorian government with technical support in capacity building on earthquake resistant construction, capitalizing SDC’s experiences from Pakistan and Haiti.
Región/País | Tema | Período | Presupuesto |
---|---|---|---|
Ecuador |
Educación Asistencia humanitaria y RRC Cambio climático y medio ambiente nothemedefined
Education facilities and training
Reconstrucción y rehabilitación (till 2016) Reducción de riesgos de catástrofes |
18.10.2016
- 31.12.2018 |
CHF 676’300
|
- Improved skills in earthquake resistant construction of local masonry, carpenters, engineers and architects.
- Mainstreaming of confined masonry technique in national educationqal institutions.
- Support national awareness campaign on the new Ecuadorian Construction Norms with key messages on earthquake resistant confined masonry.
- 10 trained master trainers of EcoSur, Municipality of Pedernales, SECAP & Holcim.
- Trained masons and construction technicians in seismic resistant (re-) construction using confined masonry.
- Dissemination of Key Messages for the Ecuadorian Construction Norms in collaboration with UNDP.
- Mainstream training programmes with SENESCYT.
- Financial Support to NGO EcoSur for reconstruction sites (26 houses)
- +, which will also act as hands-on training sites.
- Obra Suiza de Ayuda Obrera
-
Sector según clasificación del comité de ayuda al desarrollo de la OCDE EDUCACIÓN
RECONSTRUCTION RELIEF & REHABILITATION
DISASTER PREVENTION AND PREPAREDNESS
Sub-Sector según clasificación del comité de ayuda al desarrollo de la OCDE Education facilities and training
Ayuda a la reconstrucción y rehabilitación
Prevención de desastres
Temas transversales Prevención de conflictos
El proyecto tiene en cuenta la igualdad de género como tema transversal.
Tipo de ayuda Contribución a proyectos y programas
Implementación directa COSUDE
Número de proyecto 7F09671
Contexto |
An earthquake of the magnitude of 7.8 hit Ecuador on 16 April 2016, with Epicenter near Pedernales. The Ecuadorian Government declared a “State for Exception” for 6 (out of 24) provinces, with Pedernales being declared a “disaster zone” as a result of limited access due to extensive infrastructure damage. Following SDC/HA’s emergency and early recovery interventions, and based on the request from the Ecuadorian Ministry of Foreign Affairs and the exchange with the Ecuadorian Ambassador in Switzerland, SDC/HA conducted a needs and fact-finding mission for technical support in earthquake resistant reconstruction. Based on this mission, it was decided to launch a direct action, capitalizing the experiences acquired in Pakistan and Haiti. |
Objetivos |
Reduce the risk of earthquake related damages and fatalities by contributing to earthquake resistant (re-) construction through capacity building of construction personnel in the earthquake resistant technique of confined masonry. The training, knowledge transfer and awareness rasiing will be adapted to the local context and is mainstreamed through the national and local institutions. The intervention consists of a bilateral support to the local NGO EcoSur, who will provide hands-on training sites in confined masonry. |
Grupos destinarios |
Masons and other stakeholders active in construction, including the Ecuadorian educational institutions, and indirectly the population of Pedernales. Populations in areas affected by the earthquake where damage is particularly high but who are not covered under the MIDUVI (Ministerio de Desarrollo Urbano y Vivienda) post-earthquake assistance programme. The direct initial beneficiaries are national organisations and institutions which will receive trained master trainers and training packages including all educational material needed for future trainings (SECAP, SENESCYT, Municipality of Pedernales, EcoSur, HOLCIM). |
Efectos a medio plazo |
|
Resultados |
Resultados previstos: Resultados de las fases anteriores: Following the earthquake the SHA provided emergency and early recovery support in WASH and Shelter to Pedernales and nearby regions. |
Dirección / Officina Federal responsable |
COSUDE |
Crédito |
Ayuda humanitaria |
Contrapartes del proyecto |
Contraparte del contrato ONG internacional o extranjera Otras contrapartes Relevant governmental, national and international partners. |
Coordinación con otros proyectos y actores | Swiss Embassy, UNDP, SENESCYT, SECAP, and Municipality of Pedernales |
Presupuesto | Fase en curso Presupuesto suizo CHF 676’300 Presupuesto actual suizo ya emitido CHF 657’475 |
Fases del proyecto |
Fase 1 18.10.2016 - 31.12.2018 (Completed) |