Armenia SET Floods June 2024
Due to heavy rainfall since 25./26.05.2024, severe flooding occurred in two regions of Armenia, which caused some casualties and serious damage to infrastructural facilities such as bridges, roads, railroad lines, pump stations etc. The Armenian authorities asked for international support and accepted Switzerland’s offer for assistance through the deployment of a “SofortEinsatzTeam / SET”, specialized in carrying out structural assessments of damaged infrastructure. Decisions on optimum use of funds will be taken by the Crisis Cell chaired by the Head of HA in close coordination with the desk and Swiss representation in the country.
Región/País | Tema | Período | Presupuesto |
---|---|---|---|
Armenia |
Asistencia humanitaria y RRC
Eficacia humanitaria
|
03.06.2024
- 30.06.2024 |
CHF 100’000
|
- Obra Suiza de Ayuda Obrera
-
Sector según clasificación del comité de ayuda al desarrollo de la OCDE EMERGENCY RESPONSE
Sub-Sector según clasificación del comité de ayuda al desarrollo de la OCDE Relief co-ordination; protection and support services
Tipo de ayuda Implementación directa COSUDE
Número de proyecto 7F11421
Contexto | Two regions in Armenia (Lori and Tavush), which were mainly affected by the flooding |
Objetivos | The Armenian authorities in charge of the disaster response are supported in coping with the consequences of the flooding |
Grupos destinarios |
Directly: Armenian authorities / National Agency of Emergency Management (NEMA), namely the Ministry of Territorial Administration and Infrastructure Indirectly: Population in Armenia affected by the flooding, having lost or at risk of losing livelihood or infrastructure and lives |
Efectos a medio plazo | Contribution to the response activities of the Armenian authorities in charge, through engineering expertise to evaluate the infrastructure damaged by the flooding, such as brigdes, roads, railroad lines, pump stations etc. |
Resultados |
Resultados previstos: Assessment missions in the affected regions and evaluation of damaged infrastructre as well as definition of possible action lines for the recovery phase |
Dirección / Officina Federal responsable |
COSUDE |
Contrapartes del proyecto |
Contraparte del contrato |
Presupuesto | Fase en curso Presupuesto suizo CHF 100’000 Presupuesto actual suizo ya emitido CHF 16’604 Total del proyecto desde la primera fase Presupuesto suizo CHF 0 Presupuesto inclusive contrapartes del proyecto CHF 500’000 |
Fases del proyecto |
Fase
2
08.07.2024
- 31.12.2025
(Fase en curso)
Fase 1 03.06.2024 - 30.06.2024 (Active) |