Wastewater Collection and Treatment in Zenica


The project, co-financed with the German Development Bank (Kreditanstalt für Wiederaufbau, KfW) entails the construction of a wastewater treatment plant (WWTP) and necessary measures for the municipal wastewater network. Additionally, activities for Corporate Development of the public utility and minor urban development measures are planned.

Land/Region Thema Periode Budget
Bosnien und Herzegowina
Städtische Infrastruktur und Versorgung
30.11.2017 - 30.05.2022
CHF 5'610'000
Hintergrund Today, still only 31% of population of Bosnia and Herzegovina have access to wastewater services, but at present 12 WWTP are in preparation or under construction in the country. In the city of Zenica, at the moment, approximately 75% of the urban population are already connected to the central sewage network. However, the municipal wastewater is discharged into the river Bosna without treatment and is additionally mixed with the industrial wastewater. The discharge of untreated urban wastewater leads to a considerable pollution of the river and health risks for the population.
Ziele The overall objective (impact) of this project is the protection of the environment, specifically of the Bosna river and the improvement of the living conditions of the population of Zenica as well as the downstream localities in Bosnia Herzegovina. Accorrdingly, the goal is to introduce reliable and sustainable wastewater services for the population in Zenica.
Mittelfristige Wirkungen To establish the collection, transmission and treatment of municipal wastewater of the City of Zenica in an environmentally sound and hygienic manner at affordable costsThe public utility shall run in an economically sustainable way within a functioning and adequate institutional and regulatory frameworkTo contribute to the sustainable and green urban development within the City of Zenica
Resultate

Erwartete Resultate:   Sewerage network and main collectors are rehabilitated and/or extendedThe waste water treatment plant is constructed and is put in operationThe sewerage infrastructure is operated and maintained sustainablyNew bike lanes (or similar urban development measures) are constructed


Verantwortliche Direktion/Bundesamt SECO
Kreditbereich Ostzusammenarbeit
Projektpartner Vertragspartner
  • KfW Bankengruppe


Budget Laufende Phase Schweizer Beitrag CHF   5'610'000 Bereits ausgegebenes Schweizer Budget CHF   0 Budget inklusive Projektpartner CHF   21'582'000
Projektphasen Phase 10 30.11.2017 - 30.05.2022   (Laufende Phase)